Customization: | Available |
---|---|
Power: | 50-200kW |
Standard: | Standard |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product name | Horizontal high temperature air preheater |
Keyword | air preheater |
Material | Q345 Q235 |
Size | Customized Size |
Color | Customized |
Application Fields | Factories, gas station, etc |
Tolerance | ±1% |
Processing Service | Bending, Welding, Decoiling, Cutting, Punching |
1. who are we?
Jinan Huangtai Gas Furnace Co., Ltd. is a manufacture enterprise engaged in various coal gas equipment and supporting de-dusting equipment, sewage treatment equipment, desulfuring equipment, B-class boiler, etc. It is also a design company in complete electric and automatic system, providing package service from product design, manufacturing, installation, commissioning to after-sale service.
2. how can we guarantee quality?
The company set up more than 20 quality inspectors and advanced testing equipment to ensure strict testing from raw materials to every step of production.
3.what can you buy from us?
Single-stage/two-stage fixed-bed coal gas producer of various specifications; Circulating fluidized bed gasifier of various specifications; Supporting purification equipment for gasification furnace (quench tower, scrubbing tower, intercooler, wet-type electric precipitator, electrical tar precipitator, and special service valves for various coal gas); desulfurization equipment and system, coal gas waste heat recovery system, etc.
4. what are the advantages of horizontal high temperature air preheater ?
(1)Due to the horizontal installation, the flue gas inlet box is no longer made into a tall and heavy part because of the role of the equipment base and the rectifying flue gas, but only serves as the gap between the reactor and the air preheater. A transfer function, so it can be made into the structural form of the stay section of the reaction furnace and the length is reduced, which greatly reduces the manufacturing cost of the flue gas inlet box.
(2)The external steel frame used by the vertical air preheater is reduced, the material and processing costs for making the steel frame are subtracted, and the load-bearing load of the foundation due to the weight of the equipment and the wind load caused by the excessively high equipment are also reduced.
(3)The angle of the flue gas at the flue gas inlet box and before entering the raw oil preheater is reduced, the flue gas resistance is reduced, and the flue gas flow is smoother and the pressure loss is smaller.
(4)Due to the horizontal installation and use, the tube sheet and cylinder do not fully bear the gravity caused by the equipment's own weight, which greatly reduces the strength of the material. Therefore, the thickness of the material can be appropriately reduced, thereby reducing the manufacturing cost of the equipment.